CE certificated process

1

After the final sample is confirmed by the customer regarding fitting, materials, workmanship, design etc. the CE certification process can start.

2

For CE certification all swatches, mock-ups and sample were made based on final samples and according to the customers confirmation. All materials, accessories and constructions are the same that will be used in productions later on, our quality control will ensure that.

3

CE certification process is handled by each customer.

4

The results of CE tests will be sent by customer; if some materials, constructions failed the tests improvements will be done; new swatches, samples or mock-ups sent and a final CE sample must be made.

5

Only if everything was approved by the Notified Body (NoBo) and after the final confirmation from the customer the products are confirmed for productions. Only after that materials, accessories etc. can be ordered.

6

The customer will send the CE label incl. all relevant CE information and the user information booklet for the product once this was approved by the NoBo who was in charge of the CE certification of the product.

Inspection Control

Inspector work process:

Printing And Logo Control

Printing Ink

The Supplier Must Provide Testing Report (SGS Or SGT) Of Environmental. We Will Make Production Sample Before Bulk Production.

Printing Logo Inspection

1-Compare With Sample
2-Friction Testing
3-Scratching

Ink For TPR

The Supplier Must Provide Testing Report(SGS Or SGT)Of Environmental. We Will Make Production Sample Before Bulk Production: Color, Hardness And Firmness Must Be Same As Sample.

TPR Logo Inspection

1-Compare With Sample
2-Firction Testing
3-Tearing
4-Scratching

CARBON Or PVC Knuckle

Supplier Must Provide The Testing Report (SGS Or SGT). We Must Follow Customer’s Confirmed Sample Which Pass CE Testing.

Material control

1)All materials must pass Tests regarding harmful substances. The supplier must prove this by sending test reports regarding REACH from SGS, CTC or other certified lab.
2)The materials will be ordered at same supplier as for CE samples. All materials will be checked to make sure they meet CE requirements and test results.
E.g.:

The leather will be test in 5 steps:

1-Eye seeing: checking the leather under light

2-Pulling test: pull the leather by hand

3-Weight checking: checking the gram weight by machine

4-Sewing test: sewing worker test the leather elastic by machine

5-Friction test: test the leather’s friction by machine

The fabrics will be test as following:

1-Compare the color & thickness with confirmed sample.

2-Use machine to check the fabric elastic force.

3)Accessories: Compare with the confirmed sample for color & thickness.
4)Yarn: Check the order & style, use machine to test strength of thread.
5)Packing materials (include label & hangtag & sticker & polybag): Make samples based on customer’s request. After confirmation we can purchase, must be same quality. Once received bulk quantity it will be compared with confirmed sample corresponding color & quality & thickness. We'll make sure that the correct labels and hangtags will be put on the gloves.
6)Take a note for every batch number of each parcel.

Cutting control

Leather

Before cutting, compare with confirmed sample or gloves product instruction. Make sure on the color, direction and quantity of leather. Use thickness gauge to test the thickness.

Fabric

Before cutting, compare with confirmed sample or gloves product instruction. Make sure on color, thickness, direction and quantity. The size for first layer and bottom layer must be same.

Cutting

Use cutting molds and specified machine to punch.

Sewing Quality Control

Inspect the sewing machine and working situation before and during the production.
Make production sample before bulk production and compare with final confirmed CE sample.
Inspector must spot check the gloves on each sewing step. The defected quantity must control under 1%. The 1% must be repair immediately. If more than 1%, sewing will be stopped and find the problem parts and reproduce or repair the defected qty immediately.
Inspector must inspect the glove 100% on half sewing step. The defected quantity must control under 3%. The 3% must be repair immediately. If more than 3%, sewing will be stopped and find the problem parts and reproduce or repair the defected qty immediately.
Inspector must inspect the glove 100% on finishing quantity. The defected quantity must control under 3%. The 3% must repair immediately. If more than 3%, sewing will be stopped and find the problem parts and reproduce or repair the defected qty immediately.

Shipping sample

For every shipment we need to send one pair shipping sample to customer for checking the quality, after confirmation, order can be shipped out.